|
2502000405
|
10.05.25 |
LOAD CELLS WITH CONTROLLER FOR TUNDISH SEIGHING SYSTEM OF CCM-I |
1
|
0
|
|
MSP budget Rs.40.00 lakh is required. eNote moved on 10-May-2025. |
|
2502000387
|
06.05.25 |
CONDENSING & EVAPORATING UNIT FOR 2T COOLING SYSTEM |
2
|
1
|
|
|
|
2502000232
|
22.04.25 |
THYRISTOR FUSE 710A |
1
|
1
|
|
|
|
2502000231
|
21.04.25 |
SLIPRING MOTOR FOR OR COVER CAR |
1
|
1
|
|
Motor lifted by M/s Wheel Board on 17/12/2025 |
|
2502000168
|
18.04.25 |
CRANE OPERATOR CABIN CHAIR FOR EOT CRANES OF SMS-I |
1
|
1
|
|
|
|
2502000167
|
18.04.25 |
RELAY CONTACTORS FOR GCP AND LD CONVERTERS |
1
|
1
|
|
|
|
2502000011
|
02.04.25 |
CIRCULAR LIFTING MAGNET FOR SCRAP LOADING |
1
|
1
|
|
|
|
2469000018
|
01.07.24 |
WATER COOLED CABLE FOR VAR |
1
|
1
|
|
|
|
2454000023
|
06.08.24 |
FIBRE BRAIDED CERAMIC ROPE FOR SLAG CAR |
1
|
1
|
|
|
|
2450000224
|
10.01.25 |
CEILING AND EXHAUST FANS FOR SMS-I |
2
|
1
|
|
|