2350000189
|
18.12.2023 |
LED FLOOD LIGHT 100W (300EA) |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 39 |
29.06.2024 |
Inspection by I/O carried out at Bay-27, Central Stores |
|
|
|
|
2350000061
|
09.06.2023 |
SELF AMALGATING INSULATION TAPE (50 SET) |
1
|
1
|
|
|
|
| No Activity against this PR entered so far.
Click
here to add one.
|
|
|
2350000030
|
15.06.2023 |
SILICON DIOXIDE TAPES FOR CABLE PROTECTION |
2
|
1
|
|
|
|
| No Activity against this PR entered so far.
Click
here to add one.
|
|
|
2350000010
|
09.06.2023 |
WIRE BREADED CABLE PROTECTION WRAP 60MM (400 MTR) |
1
|
1
|
|
|
|
| No Activity against this PR entered so far.
Click
here to add one.
|
|
|
2321000092
|
12.03.2024 |
EPOXY BASED FLOOR COATING FOR PANEL ROOMS OF SMS-I. |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 3 |
12.03.2024 |
PR Created and finalized. |
Epoxy based floor coating material for Planning Room, etc. |
|
|
|
2320000147
|
11.03.2024 |
DUST REMOVER AND CLEANER |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 4 |
12.03.2024 |
PR finalized (created on 11/03/2024) |
Dust Remover and Cleaner |
|
|
|
2312000116
|
27.02.2024 |
RECONDITIONING OF SLIPRING INDUCTION MOTOR 400L10 (CR # 222 MH) |
1
|
0
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 6 |
18.03.2024 |
Case dropped. |
BO price was too high considering scrap Cu. price as per Sri P.K. Rout, GM, F&A) |
|
|
|
2302100025
|
02.05.2023 |
MOTOR FOR TORCH UP-DOWN OF CCM-I |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 121 |
22.03.2025 |
E-mail sent to MM regarding delivery pending. |
|
|
| 77 |
08.10.2024 |
Budget allocated by MSS. Reply given and talked to MJ (Mr Deepak Behera) for PO placement. |
|
|
| 76 |
07.10.2024 |
Note moved for allocation of Spares Proc budget INR 4.45 lakh for FY2024-25. |
The PR was projected for FY2023-24. |
|
| 48 |
29.07.2024 |
Price reasonability eNote replied to MM-Purchase. |
|
|
|
|
2302003777
|
21.03.2024 |
CONDENSING AND EVAPORATING UNITS 1.5TR |
2
|
0
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 19 |
07.05.2024 |
037b posted in SRM on 07/05/2024 with HOD approval. |
|
|
|
|
2302003749
|
15.03.2024 |
COOLING SPARES FOR LD PLC PANEL |
2
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 47 |
19.07.2024 |
All items issued and kept in LTSS-3 (CCM-I) |
|
|
| 11 |
18.04.2024 |
Mail sent to MM(P) for placement of PO after 037b approved by HOD. |
|
|
| 10 |
17.04.2024 |
Technical recommendation approved by HOD (in SRM). |
|
|
|
|
2302003609
|
02.03.2024 |
SQ.CAGE INDUCTION MOTOR 160M4 |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 45 |
18.07.2024 |
Revised 037b eNote initiated on 18/07/2024 |
|
|
| 28 |
01.06.2024 |
Presentation given in GEM by 3 firms checked and recommendation posted. Also mailed to MM-Purchase. |
|
|
| 25 |
23.05.2024 |
037b sent through GEM and eNote. Informed to Mr Chandrasekhar Saha through email. |
|
|
|
|
2302003597
|
02.03.2024 |
LIMIT SWITCHES FOR SSM, CONVERTERS AND MIXER (Jai Balaji) |
4
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 16 |
26.04.2024 |
Technical recommendation posted and approved by HOD (in SRM). |
|
|
|
|
2302003474
|
19.02.2024 |
CARBON PADS FOR CRANES |
2
|
1
|
|
|
|
| No Activity against this PR entered so far.
Click
here to add one.
|
|
|
2302003456
|
19.02.2024 |
FRAME FOR 400A CURRENT COLLECTOR |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 15 |
18.04.2024 |
Mail sent to MM(P) for placement of PO after 037b approved by HOD. |
|
|
| 14 |
17.04.2024 |
Technical recommendation approved by HOD (in SRM). |
|
|
|
|
2302003337
|
09.02.2024 |
AIR CIRCUIT BREAKER 3200A |
1
|
2
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 110 |
23.01.2025 |
Mail sent to MM regarding pending delivery. |
|
|
| 29 |
01.06.2024 |
Clarifications checked and 037b posted in SRM. Approved by HOD. |
|
|
|
|
2302003255
|
03.02.2024 |
SLIP RING INDUCTION MOTOR 400L10 D/S FOR CCM-I |
1
|
1
|
|
Delivery pending since 06/01/2025 |
|
| Id |
Date |
Activity |
Remarks |
|
| 120 |
08.03.2025 |
eNote moved for extension of delivery till 30/03/2025 as per email dt.05/03/2025. |
|
|
| 41 |
09.07.2024 |
Drawing and MDS approved and sent back to the party as well as MM(Purchase) |
|
|
| 40 |
08.07.2024 |
Drawings received from Wheel Board for approval through email. |
|
|
| 18 |
25.04.2024 |
Mail sent to DGM(MM-Pur) for clarifications and additional documents on GEM bids. |
Some bids were having discrepancies. |
|
| 7 |
18.03.2024 |
Budget of Rs.25.80 lakh allocated visiting MSS. PR finalized and released by I/O and HOS. |
Budget of Rs.25.80 lakh allocated visiting MSS. PR finalized and released by I/O and HOS. |
|
|
|
2302003038
|
15.01.2023 |
30 KW VARIABLE SPEED DC CONTROLLER FOR CCM-I |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 20 |
07.05.2024 |
037b posted in SRM on 07/05/2024 with HOD approval. |
|
|
|
|
2302002871
|
01.01.2024 |
SQ. CAGE INDUCTION MOTOR 180L4 |
1
|
0
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 92 |
12.11.2024 |
eNote moved to drop the case. |
|
|
| 80 |
24.10.2024 |
New vendors (motor OEMs) suggested for LTE via mail to Ms Swagatike Behera |
|
|
| 65 |
09.09.2024 |
Mail received from MJ regarding revised 037b. Suggested for retendering in GEM. |
The bid was not appearing in GEM. |
|
| 22 |
09.05.2024 |
Technical recommendation posted in GEM and eNote initiated. |
|
|
|
|
2302002770
|
20.12.2023 |
SLIPRING INDUCTION MOTOR 160L6 |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 69 |
21.09.2024 |
Inspection by I/O carried out at Bay-6, Central Stores |
|
|
| 24 |
22.05.2024 |
Drawing approved and sent to M/s Wheel Board. |
|
|
| 21 |
09.05.2024 |
Technical recommendation approved by HOD (in SRM). |
|
|
|
|
2302002748
|
18.12.2023 |
PLC BASED ELECTRODE REGULATION PANEL FOR VAR |
1
|
0
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 35 |
20.06.2024 |
037b note moved on 20-Jun-2024. The case was retendered twice in GEM. |
|
|
| 23 |
21.05.2024 |
037b eNote initiated and sent to MM(Purchase) Mr Santanu Ghosh |
|
|
|